Street elevation of homes undergoing Axis window renewal works with scaffold access in place.
Home | Case study | Window Renewal Project

Window Renewal Project

Sector

Blue Light

Location

London

Service

Planned Maintenance

Axis was appointed by the London Fire Brigade (LFB) to complete a window renewal project at their iconic Kings Road Fire Station in Chelsea. The project involved erecting full scaffolding to the Fire Station complete with goods hoist for the windows and materials, bridging the scaffolding over the emergency automated Fire Engine doors to ensure the Fire Fighters could attend emergency calls without works obstructing their quick exit.

LFB

Axis completed window renewals across 9 weeks at Chelsea Fire Station for the London Fire Brigade

Project Details

Our work commenced with the removal of the old windows utilising an approved Asbestos Specialist to undertake an inspection for any suspected asbestos contamination within and surrounding the old windows, which then enabled their safe removal under controlled conditions. The new windows were fitted throughout all three floors, which had to be phased to ensure the installation of these windows were fitted immediately after each removal was complete and certified safe for the fitting team, this was to ensure we maintained a safe working environment and so that the security and wind/weather tightness of the building was not compromised at any time for the duration of our works.

All the high-level windows were fitted with auto opening mechanisms to provide adequate fresh air and ventilation circulation naturally within the building. Other internal and external facilitating works were carried out and included; ceiling renewals, electrical installations, ventilation and air conditioning. Concrete repairs and painting work was carried out to the external facades of the building.

Specifications

  • Asbestos inspection and removal
  • Full scaffolding with goods hoist
  • Asbestos specialist window removal
  • Ceiling renewals
  • Exterior facade works
  • M&E works (ventilation and air conditioning)
Fieldway

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

0151 480 9909
enquiries@fieldway.co.uk

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

Download

You may also be interested in...

Capital Shopping Centres – Fire Protection and Structural Encapsulation

Fieldway delivered 30,000m² of passive fire protection at operational Eldon Square shopping centre in Newcastle.

Steel girders under white arch

The Mall Blackburn – Fire Protection and Insulation

Fieldway delivered passive fire protection and 4,700m² of soffit insulation at The Mall Blackburn shopping centre.

Kier Construction Ltd – Electrical Installation

Fieldway delivered phased temporary electrical installations for Kier across a 71,000 sq ft C.R. Laurence development.

Salford City Council – Fire Alarm Upgrade

Fieldway upgraded the fire alarm system at the 20-bed Barton Moss Secure Care Centre for Salford City Council.

Wythenshawe Community Housing Group – Fire Alarm Upgrade Programme

Fieldway upgraded fire alarm systems across nine 16-storey Wythenshawe Community Housing Group blocks in South Manchester.

PA Housing – Fire Safety Maintenance and Compliance Programme

Fieldway delivers a seven-year fire safety maintenance programme for PA Housing across Nottingham, Derby and Leicester.

Battersea Power Station Development Company – Fire Stopping and Acoustic Sealing

Fieldway delivered specialist passive fire and acoustic sealing works within the iconic Battersea Power Station redevelopment in London.

Jigsaw Homes Group – Fire Compartmentation and Passive Fire Remediation

Fieldway delivers passive fire remediation and compartmentation surveys for Jigsaw Homes across its national property portfolio..

Transport for Greater Manchester – Fire and Electrical Compliance

Fieldway maintains fire and electrical systems across 28 Transport for Greater Manchester sites throughout Manchester.

Fire door, brick wall, red fire extingusher

E3 Cube – Schools and Academies Fire Safety Improvement

Fieldway delivered fire safety improvements across five schools and academies in the North of England with E3 Cube.

Wirral Borough Council – Lingham Primary School Fire Alarm Upgrade

Fieldway upgraded the fire alarm system at Lingham Primary School in Moreton for Wirral Borough Council.

Your Housing Group – Major Property Electrical Inspection Programme

Fieldway completed 4,000 EICRs across Your Housing Group’s portfolio, including C1 and C2 electrical remedial works.

BAM Construction – Site Set-Up and Building Fit-Out

Fieldway provided BAM Construction with site set-up and fit-out support across two Manchester city-centre construction projects.

Cobalt Housing – Fire Safety Servicing, Maintenance and Upgrades

Fieldway delivers fire safety servicing and fire alarm upgrades across 960 Cobalt Housing properties in Liverpool.

Mosscare St Vincent’s – Fire Door FRA Remedials

Fieldway delivers fire door remedial works for Mosscare St Vincent’s following Fire Risk Assessment recommendations across the North West.

Johnnie Johnson Housing – Compartmentation and Fire Doors

Fieldway delivered compartmentation, fire door and FRA remedial works across more than 80 Johnnie Johnson Housing properties.

Housing Solutions – Fire Compartmentation and Fire Door Remediation

Fieldway delivered passive fire protection and fire door remediation across three Housing Solutions properties in Berkshire.

operative in high vis testing an electrical outlet

Together Housing – Electrical Inspection and Compliance

Fieldway completed EICRs and remedial electrical works across 985 Together Housing properties in Yorkshire and Lancashire.

Countess of Chester Hospital – Fire and Security Alarm Replacement

Fieldway is replacing fire and security alarm systems within the live healthcare environment at Countess of Chester Hospital in Chester.

operative in orange high vis vest testing newly installed alarm system

Southway Housing Trust – Fire Safety and Building Systems Maintenance

Fieldway maintains fire and building systems across 6,000 Southway Housing Trust properties throughout Manchester.