Home | Case study | LINAC Removal & Installation – St Bartholomew’s Hospital

LINAC Removal & Installation - St Bartholomew's Hospital

Sector

Healthcare

Location

London

Service

Refurbishment

Concept completed enabling works to support the removal of an existing LINAC machine and the installation of a new unit within St Bartholomew’s Hospital. We installed temporary partitions to segregate the work area and protect adjacent clinical spaces. We protected existing flooring within the control room and removed floor finishes within the exam room to allow access for equipment works. 

We removed lighting fittings above the equipment for reuse and partially removed the suspended ceiling to allow the Varian unit to be removed and reinstalled. Concept isolated chilled water services and exposed floor trunking to enable alterations. We isolated and removed the existing mains panel as part of the preparatory works. We completed builders’ work, including floor chasing for equipment containment and alterations to partitions to suit the new mains panel. Concept installed a free issue optical imager and an IRM mounting post to the existing ceiling. 

What we did

Delivered coordinated enabling works to support the safe removal of an existing LINAC and the installation of new equipment within a live hospital environment.

Specifications

  • Temporary partitions for site segregation
  • Protection and removal of floor finishes within control and exam rooms
  • Partial removal and reinstatement of suspended ceiling systems
  • Isolation and alteration of chilled water services
  • Floor chasing and partition alterations for equipment containment
  • Installation of optical imager and IRM mounting post
  • Pressure testing, flushing, and certification of mechanical systems
  • Electrical containment and power supplies for new LINAC equipment
  • Renewal of grid ceiling section measuring approximately 5m x 3m
  • Localised making good, minor decorations, and joinery relocation

Project Overview

Number of months

2

Contract Value

£

70

K

The primary challenge involved working within a live healthcare setting where access, safety, and continuity of adjacent services were critical. We managed segregation, protection, and sequencing to control risk and maintain hospital operations throughout the programme. 

Concept coordinated mechanical and electrical activities to align with equipment installation requirements. Mechanical works included local pressure testing, system flushing, and certification. Electrical works included containment for new PDB and ERB units, installation of a free issue Heatherose equipment panel, rewiring of warning lights, and new power supplies for equipment. We removed and reinstated relax and view panels to suit the revised layout and allowed for the removal and reinstatement of fire alarm systems under a provisional sum. 

Innovations, challenges, solutions

Maintained service continuity by sequencing the works and coordinating trades to reduce disruption within critical hospital spaces.

Fieldway

Have a project to discuss?

0151 480 9909
enquiries@fieldway.co.uk

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in...

Capital Shopping Centres – Fire Protection and Structural Encapsulation

Fieldway delivered 30,000m² of passive fire protection at operational Eldon Square shopping centre in Newcastle.

Steel girders under white arch

The Mall Blackburn – Fire Protection and Insulation

Fieldway delivered passive fire protection and 4,700m² of soffit insulation at The Mall Blackburn shopping centre.

Kier Construction Ltd – Electrical Installation

Fieldway delivered phased temporary electrical installations for Kier across a 71,000 sq ft C.R. Laurence development.

Salford City Council – Fire Alarm Upgrade

Fieldway upgraded the fire alarm system at the 20-bed Barton Moss Secure Care Centre for Salford City Council.

Wythenshawe Community Housing Group – Fire Alarm Upgrade Programme

Fieldway upgraded fire alarm systems across nine 16-storey Wythenshawe Community Housing Group blocks in South Manchester.

PA Housing – Fire Safety Maintenance and Compliance Programme

Fieldway delivers a seven-year fire safety maintenance programme for PA Housing across Nottingham, Derby and Leicester.

Battersea Power Station Development Company – Fire Stopping and Acoustic Sealing

Fieldway delivered specialist passive fire and acoustic sealing works within the iconic Battersea Power Station redevelopment in London.

Jigsaw Homes Group – Fire Compartmentation and Passive Fire Remediation

Fieldway delivers passive fire remediation and compartmentation surveys for Jigsaw Homes across its national property portfolio..

Transport for Greater Manchester – Fire and Electrical Compliance

Fieldway maintains fire and electrical systems across 28 Transport for Greater Manchester sites throughout Manchester.

Fire door, brick wall, red fire extingusher

E3 Cube – Schools and Academies Fire Safety Improvement

Fieldway delivered fire safety improvements across five schools and academies in the North of England with E3 Cube.

Wirral Borough Council – Lingham Primary School Fire Alarm Upgrade

Fieldway upgraded the fire alarm system at Lingham Primary School in Moreton for Wirral Borough Council.

Your Housing Group – Major Property Electrical Inspection Programme

Fieldway completed 4,000 EICRs across Your Housing Group’s portfolio, including C1 and C2 electrical remedial works.

BAM Construction – Site Set-Up and Building Fit-Out

Fieldway provided BAM Construction with site set-up and fit-out support across two Manchester city-centre construction projects.

Cobalt Housing – Fire Safety Servicing, Maintenance and Upgrades

Fieldway delivers fire safety servicing and fire alarm upgrades across 960 Cobalt Housing properties in Liverpool.

Mosscare St Vincent’s – Fire Door FRA Remedials

Fieldway delivers fire door remedial works for Mosscare St Vincent’s following Fire Risk Assessment recommendations across the North West.

Johnnie Johnson Housing – Compartmentation and Fire Doors

Fieldway delivered compartmentation, fire door and FRA remedial works across more than 80 Johnnie Johnson Housing properties.

Housing Solutions – Fire Compartmentation and Fire Door Remediation

Fieldway delivered passive fire protection and fire door remediation across three Housing Solutions properties in Berkshire.

operative in high vis testing an electrical outlet

Together Housing – Electrical Inspection and Compliance

Fieldway completed EICRs and remedial electrical works across 985 Together Housing properties in Yorkshire and Lancashire.

Countess of Chester Hospital – Fire and Security Alarm Replacement

Fieldway is replacing fire and security alarm systems within the live healthcare environment at Countess of Chester Hospital in Chester.

operative in orange high vis vest testing newly installed alarm system

Southway Housing Trust – Fire Safety and Building Systems Maintenance

Fieldway maintains fire and building systems across 6,000 Southway Housing Trust properties throughout Manchester.