Home | Case study | Adelphi Theatre – Roof Systems Renewal

Adelphi Theatre - Roof Systems Renewal

Sector

Retail & Commercial

Location

London

Service

Responsive Repairs

The project addressed long-standing issues to landlocked roof areas discharging into an internal lightwell, where blocked drainage had resulted in repeated water ingress. The scope focused on roof renewal, improved drainage performance, and the provision of safe access for future maintenance.

Works included replacement of perished lead coverings with new Code 5 lead on upgraded substrates, installation of new lead valleys and gutters, replacement of failed slate with Welsh slate, and renewal of the upper roof using a seamless Sika GRP system. Roof access was improved through the removal of cast-iron cat ladders and installation of aluminium safety-hooped ladders, GRP walkways, and up-and-over stair access.

What we did

Renewal of complex roof systems and access arrangements on a Grade II listed theatre to resolve water ingress and improve safety while protecting historic fabric.

Specifications

  • Installation of new Code 5 lead coverings on upgraded timber substrates
  • Provision of vapour control layers, insulation, waterproof membranes, and improved ventilation
  • Formation of new lead valleys and rainwater gutters
  • Replacement of deteriorated roof areas with Welsh slate laid over a modern roofing membrane
  • Renewal of the upper roof using a seamless Sika GRP roofing system
  • Installation of aluminium safety-hooped ladders, GRP access walkways, and up-and-over stair access
  • Works undertaken in a highly congested central London location, requiring carefully managed logistics and controlled delivery schedules
  • Heritage-compliant detailing to protect and preserve the listed building

Project Overview

Number of months

5

Contract Value

£

300

K

The primary challenge involved delivering heavy structural alterations within a confined, live environment. We adopted a phased approach to slab removal, using scaffold decks to safely support sections during cutting and extraction. Mechanical demolition of concrete walls, staircases, and the basement floor allowed safe clearance for the new structure. 

To manage limited space, we established a secure compound for materials and waste, supported by off-site storage to reduce congestion. Temporary lighting addressed low natural light levels during winter works. We maintained strict health and safety controls, with daily coordination and clear site management procedures to ensure steady progress and minimal disruption.

Innovations, challenges, solutions

Overcame site and access constraints through phased working, off-site storage, and controlled logistics planning

Fieldway

Have a project to discuss?

0151 480 9909
enquiries@fieldway.co.uk

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in...

Capital Shopping Centres – Fire Protection and Structural Encapsulation

Fieldway delivered 30,000m² of passive fire protection at operational Eldon Square shopping centre in Newcastle.

Steel girders under white arch

The Mall Blackburn – Fire Protection and Insulation

Fieldway delivered passive fire protection and 4,700m² of soffit insulation at The Mall Blackburn shopping centre.

Kier Construction Ltd – Electrical Installation

Fieldway delivered phased temporary electrical installations for Kier across a 71,000 sq ft C.R. Laurence development.

Salford City Council – Fire Alarm Upgrade

Fieldway upgraded the fire alarm system at the 20-bed Barton Moss Secure Care Centre for Salford City Council.

Wythenshawe Community Housing Group – Fire Alarm Upgrade Programme

Fieldway upgraded fire alarm systems across nine 16-storey Wythenshawe Community Housing Group blocks in South Manchester.

PA Housing – Fire Safety Maintenance and Compliance Programme

Fieldway delivers a seven-year fire safety maintenance programme for PA Housing across Nottingham, Derby and Leicester.

Battersea Power Station Development Company – Fire Stopping and Acoustic Sealing

Fieldway delivered specialist passive fire and acoustic sealing works within the iconic Battersea Power Station redevelopment in London.

Jigsaw Homes Group – Fire Compartmentation and Passive Fire Remediation

Fieldway delivers passive fire remediation and compartmentation surveys for Jigsaw Homes across its national property portfolio..

Transport for Greater Manchester – Fire and Electrical Compliance

Fieldway maintains fire and electrical systems across 28 Transport for Greater Manchester sites throughout Manchester.

Fire door, brick wall, red fire extingusher

E3 Cube – Schools and Academies Fire Safety Improvement

Fieldway delivered fire safety improvements across five schools and academies in the North of England with E3 Cube.

Wirral Borough Council – Lingham Primary School Fire Alarm Upgrade

Fieldway upgraded the fire alarm system at Lingham Primary School in Moreton for Wirral Borough Council.

Your Housing Group – Major Property Electrical Inspection Programme

Fieldway completed 4,000 EICRs across Your Housing Group’s portfolio, including C1 and C2 electrical remedial works.

BAM Construction – Site Set-Up and Building Fit-Out

Fieldway provided BAM Construction with site set-up and fit-out support across two Manchester city-centre construction projects.

Cobalt Housing – Fire Safety Servicing, Maintenance and Upgrades

Fieldway delivers fire safety servicing and fire alarm upgrades across 960 Cobalt Housing properties in Liverpool.

Mosscare St Vincent’s – Fire Door FRA Remedials

Fieldway delivers fire door remedial works for Mosscare St Vincent’s following Fire Risk Assessment recommendations across the North West.

Johnnie Johnson Housing – Compartmentation and Fire Doors

Fieldway delivered compartmentation, fire door and FRA remedial works across more than 80 Johnnie Johnson Housing properties.

Housing Solutions – Fire Compartmentation and Fire Door Remediation

Fieldway delivered passive fire protection and fire door remediation across three Housing Solutions properties in Berkshire.

operative in high vis testing an electrical outlet

Together Housing – Electrical Inspection and Compliance

Fieldway completed EICRs and remedial electrical works across 985 Together Housing properties in Yorkshire and Lancashire.

Countess of Chester Hospital – Fire and Security Alarm Replacement

Fieldway is replacing fire and security alarm systems within the live healthcare environment at Countess of Chester Hospital in Chester.

operative in orange high vis vest testing newly installed alarm system

Southway Housing Trust – Fire Safety and Building Systems Maintenance

Fieldway maintains fire and building systems across 6,000 Southway Housing Trust properties throughout Manchester.