Follow Us

 

Our Services

Fieldway is a UK fire safety and compliance specialist, combining active fire, passive fire, security, electrical and consultancy expertise nationwide.

View All Services

Frameworks

About Us

Fieldway is a national fire safety and compliance specialist, protecting buildings and people through five integrated services delivered nationwide.

Learn More Find out about us

Home | Case study | Air Handling Unit Replacement – Southampton General Hospital

Air Handling Unit Replacement - Southampton General Hospital

Sector

Healthcare

Location

South East

Service

Planned Maintenance

We are replacing four air handling units on the roof of the West Ward Block at Southampton General Hospital. The ward block links directly to the Centre Block, Lab and Path Block, Blood Transfusion, and Cancer Science facilities, which required careful coordination to protect clinical operations throughout the works.

The scope includes the installation of new roof-mounted general ventilation POD units supported by bespoke steelwork. We are delivering all associated structural preparation, ductwork cleaning, targeted duct alterations, and damper adjustments to improve air distribution. A new building management system is being installed with upgraded controls, wiring, and containment, alongside new CT heating pipework connections and electrical service modifications.

What we did

Delivery of a major ventilation upgrade to improve compliance, air quality, and system control within a critical hospital environment.

Specifications

  • Replacement of four roof-mounted air handling units
  • Bespoke structural steel framework for new plant
  • New building management system with advanced controls
  • Ductwork cleaning, alterations, and damper adjustments
  • CT heating pipework connections and electrical upgrades
  • LV distribution, lighting, and control cabling upgrades
  • Fire alarm modifications and compliant fire stopping
  • Lightning protection system modifications
  • Removal of redundant mechanical and electrical services

Project Overview

Duration

Ongoing

Contract Value

£

4.4

M

The existing ventilation systems no longer met current HTM requirements, creating a need for replacement within a live healthcare setting. The rooftop location and proximity to key clinical blocks required detailed planning to manage access, sequencing, and system changeovers.

We implemented a phased approach supported by new LV supplies, control cabling, and BMS integration to ensure continuity of service. Roof plantroom modifications include new lighting, fire alarm changes, fire stopping, and updates to the lightning protection system. Redundant mechanical and electrical services are being removed to leave a clean and compliant installation that supports long-term performance and patient safety.

Innovations, challenges, solutions

We are upgrading life-critical ventilation systems while maintaining safe operation across connected hospital facilities.

Fieldway

Have a project to discuss?

0151 480 9909
enquiries@fieldway.co.uk

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in...

Capital Shopping Centres – Fire Protection and Structural Encapsulation

Fieldway delivered 30,000m² of passive fire protection at operational Eldon Square shopping centre in Newcastle.

Steel girders under white arch

The Mall Blackburn – Fire Protection and Insulation

Fieldway delivered passive fire protection and 4,700m² of soffit insulation at The Mall Blackburn shopping centre.

Kier Construction Ltd – Electrical Installation

Fieldway delivered phased temporary electrical installations for Kier across a 71,000 sq ft C.R. Laurence development.

Salford City Council – Fire Alarm Upgrade

Fieldway upgraded the fire alarm system at the 20-bed Barton Moss Secure Care Centre for Salford City Council.

Wythenshawe Community Housing Group – Fire Alarm Upgrade Programme

Fieldway upgraded fire alarm systems across nine 16-storey Wythenshawe Community Housing Group blocks in South Manchester.

PA Housing – Fire Safety Maintenance and Compliance Programme

Fieldway delivers a seven-year fire safety maintenance programme for PA Housing across Nottingham, Derby and Leicester.

Battersea Power Station Development Company – Fire Stopping and Acoustic Sealing

Fieldway delivered specialist passive fire and acoustic sealing works within the iconic Battersea Power Station redevelopment in London.

Jigsaw Homes Group – Fire Compartmentation and Passive Fire Remediation

Fieldway delivers passive fire remediation and compartmentation surveys for Jigsaw Homes across its national property portfolio..

Transport for Greater Manchester – Fire and Electrical Compliance

Fieldway maintains fire and electrical systems across 28 Transport for Greater Manchester sites throughout Manchester.

Fire door, brick wall, red fire extingusher

E3 Cube – Schools and Academies Fire Safety Improvement

Fieldway delivered fire safety improvements across five schools and academies in the North of England with E3 Cube.

Wirral Borough Council – Lingham Primary School Fire Alarm Upgrade

Fieldway upgraded the fire alarm system at Lingham Primary School in Moreton for Wirral Borough Council.

Your Housing Group – Major Property Electrical Inspection Programme

Fieldway completed 4,000 EICRs across Your Housing Group’s portfolio, including C1 and C2 electrical remedial works.

BAM Construction – Site Set-Up and Building Fit-Out

Fieldway provided BAM Construction with site set-up and fit-out support across two Manchester city-centre construction projects.

Cobalt Housing – Fire Safety Servicing, Maintenance and Upgrades

Fieldway delivers fire safety servicing and fire alarm upgrades across 960 Cobalt Housing properties in Liverpool.

Mosscare St Vincent’s – Fire Door FRA Remedials

Fieldway delivers fire door remedial works for Mosscare St Vincent’s following Fire Risk Assessment recommendations across the North West.

Johnnie Johnson Housing – Compartmentation and Fire Doors

Fieldway delivered compartmentation, fire door and FRA remedial works across more than 80 Johnnie Johnson Housing properties.

Housing Solutions – Fire Compartmentation and Fire Door Remediation

Fieldway delivered passive fire protection and fire door remediation across three Housing Solutions properties in Berkshire.

operative in high vis testing an electrical outlet

Together Housing – Electrical Inspection and Compliance

Fieldway completed EICRs and remedial electrical works across 985 Together Housing properties in Yorkshire and Lancashire.

Countess of Chester Hospital – Fire and Security Alarm Replacement

Fieldway is replacing fire and security alarm systems within the live healthcare environment at Countess of Chester Hospital in Chester.

operative in orange high vis vest testing newly installed alarm system

Southway Housing Trust – Fire Safety and Building Systems Maintenance

Fieldway maintains fire and building systems across 6,000 Southway Housing Trust properties throughout Manchester.