Refurbishment - Elizabeth Barracks

Sector

Defence

Location

South East

Service

Refurbishment

We were appointed by VINCI Facilities as part of a wider Army Restaurant Programme to refurbish the Junior Rank Mess dining facility at Elizabeth Barracks. Our involvement began at RIBA Stage 2, where we worked with the client team to refine layouts and agree specifications that met both operational needs and design standards.

On site, we completed a full strip out of the existing dining and servery areas before delivering a comprehensive refurbishment. This included reconfiguring internal layouts with new partition walls, installing bespoke booth seating, and upgrading servery areas with new joinery and commercial catering equipment. We also installed new flooring, completed full redecoration, and introduced acoustic ceiling treatments to improve comfort and reduce noise levels. Electrical and mechanical upgrades were carried out to support the revised layout and ensure compliance with current standards.

What we did

We delivered a full refurbishment of the dining facility at Elizabeth Barracks with VINCI Facilities, applying our expertise to create a modern, durable, and efficient environment suited to high-volume use.

Specifications

  • Full strip out of existing dining and servery areas
  • Installation of new partition walls to reconfigure layou
  • Bespoke booth seating installation
  • New commercial catering equipment and servery joinery
  • New flooring throughout
  • Full internal redecoration
  • Acoustic ceiling tiles and baffles
  • Electrical upgrades including lighting and small power
  • Mechanical works including heating and ventilation modifications
  • Installation and upgrade of toilet facilities

Project Overview

Number of months

4

Contract Value

£

700

K

Working within a live military setting required strict adherence to security protocols and careful coordination with site operations. Our team held the necessary clearances and worked in line with established processes, which enabled efficient delivery while maintaining compliance.

We used a consistent design approach across the programme while allowing for site-specific adjustments at Elizabeth Barracks. This ensured quality and efficiency in delivery, while still meeting the unique requirements of the location and its users. Early engagement with the client also allowed us to resolve design challenges before work began on site, reducing delays and ensuring a smooth delivery programme.

Innovations, challenges, solutions

We applied early-stage collaboration and standardised design principles to deliver a consistent yet site-specific solution within a secure operational environment.

Fieldway

Have a project to discuss

0151 480 9909
enquiries@fieldway.co.uk

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in...

Capital Shopping Centres – Fire Protection and Structural Encapsulation

Fieldway delivered 30,000m² of passive fire protection at operational Eldon Square shopping centre in Newcastle.

Steel girders under white arch

The Mall Blackburn – Fire Protection and Insulation

Fieldway delivered passive fire protection and 4,700m² of soffit insulation at The Mall Blackburn shopping centre.

Kier Construction Ltd – Electrical Installation

Fieldway delivered phased temporary electrical installations for Kier across a 71,000 sq ft C.R. Laurence development.

Salford City Council – Fire Alarm Upgrade

Fieldway upgraded the fire alarm system at the 20-bed Barton Moss Secure Care Centre for Salford City Council.

Wythenshawe Community Housing Group – Fire Alarm Upgrade Programme

Fieldway upgraded fire alarm systems across nine 16-storey Wythenshawe Community Housing Group blocks in South Manchester.

PA Housing – Fire Safety Maintenance and Compliance Programme

Fieldway delivers a seven-year fire safety maintenance programme for PA Housing across Nottingham, Derby and Leicester.

Battersea Power Station Development Company – Fire Stopping and Acoustic Sealing

Fieldway delivered specialist passive fire and acoustic sealing works within the iconic Battersea Power Station redevelopment in London.

Jigsaw Homes Group – Fire Compartmentation and Passive Fire Remediation

Fieldway delivers passive fire remediation and compartmentation surveys for Jigsaw Homes across its national property portfolio..

Transport for Greater Manchester – Fire and Electrical Compliance

Fieldway maintains fire and electrical systems across 28 Transport for Greater Manchester sites throughout Manchester.

Fire door, brick wall, red fire extingusher

E3 Cube – Schools and Academies Fire Safety Improvement

Fieldway delivered fire safety improvements across five schools and academies in the North of England with E3 Cube.

Wirral Borough Council – Lingham Primary School Fire Alarm Upgrade

Fieldway upgraded the fire alarm system at Lingham Primary School in Moreton for Wirral Borough Council.

Your Housing Group – Major Property Electrical Inspection Programme

Fieldway completed 4,000 EICRs across Your Housing Group’s portfolio, including C1 and C2 electrical remedial works.

BAM Construction – Site Set-Up and Building Fit-Out

Fieldway provided BAM Construction with site set-up and fit-out support across two Manchester city-centre construction projects.

Cobalt Housing – Fire Safety Servicing, Maintenance and Upgrades

Fieldway delivers fire safety servicing and fire alarm upgrades across 960 Cobalt Housing properties in Liverpool.

Mosscare St Vincent’s – Fire Door FRA Remedials

Fieldway delivers fire door remedial works for Mosscare St Vincent’s following Fire Risk Assessment recommendations across the North West.

Johnnie Johnson Housing – Compartmentation and Fire Doors

Fieldway delivered compartmentation, fire door and FRA remedial works across more than 80 Johnnie Johnson Housing properties.

Housing Solutions – Fire Compartmentation and Fire Door Remediation

Fieldway delivered passive fire protection and fire door remediation across three Housing Solutions properties in Berkshire.

operative in high vis testing an electrical outlet

Together Housing – Electrical Inspection and Compliance

Fieldway completed EICRs and remedial electrical works across 985 Together Housing properties in Yorkshire and Lancashire.

Countess of Chester Hospital – Fire and Security Alarm Replacement

Fieldway is replacing fire and security alarm systems within the live healthcare environment at Countess of Chester Hospital in Chester.

operative in orange high vis vest testing newly installed alarm system

Southway Housing Trust – Fire Safety and Building Systems Maintenance

Fieldway maintains fire and building systems across 6,000 Southway Housing Trust properties throughout Manchester.