The Excel Exhibition Centre was extended in 2010 expanding the original facility by 50%. The coating systems to 8000 tonnes of steel were re-instated following damaged caused during transport and erection. Hundreds of uncoated splice plates were mechanically prepared and primed with a surface tolerant product...

This inner city shopping centre extension was undertaken whilst the existing shops were operational so minimal disruption was a priority. Ordinarily the BG system is cut on site at the workface which is not only noisy, it creates a lot of dust which can be...

Having previously worked for the site team on a number of smaller projects this energy from waste development was the first of three similar projects undertaken. It was one of the toughest projects we have been involved in. An enthusiastic client took possession of many...

We applied in excess of 68,000m2 of intumescent coatings as well as decorative painting to a number of the domes exhibition structures. 24 hour round the clock working and a wide range of access equipment were required in order to resource this project and enable...

Working alongside both Laing O’Rourke and the Health Trust, phased completion handovers were required to allow patients to be moved from the existing hospital into those newly completed wards....

We installed a range of Rockwool products designed to achieve the acoustic and fire performance requirements on this unique building. The design and complexity of some of the services passing through the compartment walls has resulted in bespoke product installation details being developed and approved alongside...

Working on this prestigious hotel development with tight deadlines based around the Olympics had its own unique challenges. A very tight site in fashionable Knightsbridge dictated that ‘just in time’ deliveries were vital as storage space was incredibly limited....

Remedials to primer system, intumescent coatings, soffit coating & liner, fire, acoustic & air sealing...

A board encasement system was utilised to provide the 60 minute fire protection to the steelwork on this new build development. Our ability to undertake a number of packages, fire protection, fire stopping, acoustic and air sealing and soffit insulation, minimised interface problems and...

IPCL applied a range of systems including intumescent coatings to the structural steelwork, fire stopping, air sealing and over 4700m2 of soffit insulation. In addition a Hilti structural grid system was installed to support future client’s services. This project was in the town centre so...